2000 — 2006
Entrance pavilion
Entrance pavilion & hemicycles
First major project: the old roof removed (2000), an oak frame rebuilt to the original and a chestnut-shingle roof (2001). The collapsed wall of the west hemicycle rebuilt (2001), the east hemicycle restored and the east barn fitted out (2006).